SWMS templates: what a safe work method statement must include

A safe work method statement (SWMS) is required before high risk construction work starts. Templates save time, but a SWMS only works if it matches the actual job. This page explains when you need one, what goes in it, and where to find official templates.

This is a free, non-commercial reference page. It is general information only, not professional advice, and it does not rank or recommend any business. Listing a source is not an endorsement. Check current details with the official websites linked below.

The guide

The main things to understand.

When a SWMS is required

Under the model work health and safety laws, a SWMS is required for high risk construction work, such as work at height above a set level, work near energised electrical installations, trenching, demolition and work involving certain plant or traffic. Check the list in your state's WHS regulations or the regulator's guidance.

Who prepares it

The person conducting the business or undertaking (PCBU) carrying out the high risk construction work prepares the SWMS, ideally with the workers who will do the job.

What it must include

A SWMS identifies the high risk construction work, states the hazards and risks, and describes the control measures and how they will be implemented, monitored and reviewed.

Keep it simple and site-specific

Regulators recommend a SWMS that is short, clear and specific to the job and site. A long generic document that nobody reads doesn't meet the purpose.

Using a template

A template gives you the structure, but it must be filled in for the actual task, site and conditions. WHS regulators publish free templates and examples.

Before work starts

The SWMS must be in place before the high risk work starts, and workers must be told about it. Work must stop if it isn't being done in line with the SWMS.

Reviewing and keeping it

Review and revise the SWMS when the work or conditions change, or if the controls aren't working. Keep it available for inspection for the duration of the work.

Principal contractors

On construction projects with a principal contractor, the principal contractor must take reasonable steps to obtain SWMS from contractors before high risk work starts.

Official sources

Where to check the details.

Inclusion in this directory is not an endorsement. Links are to official websites as published at the time of checking.

Before you decide

Questions worth asking.

Is this high risk construction work?
Check your state's list.
Is the SWMS specific to this job?
Generic won't do.
Have workers been consulted and told?
Before work starts.
When will it be reviewed?
When work or conditions change.

Common questions

When do I need a SWMS?

Before high risk construction work starts. Your state's WHS regulations and regulator guidance list what counts as high risk construction work.

Can I use a SWMS template?

Yes, but it must be completed for the actual job and site. Regulators publish free templates.

Who has to prepare a SWMS?

The business carrying out the high risk construction work, ideally with the workers doing it.

How long should a SWMS be?

As short as possible while still covering the job. Regulators recommend clear, site-specific SWMS over long generic ones.